CANSTAR · A.1.2 Collaborative platform (WP1) — demonstration site. Functions belonging to A.4.2 (destinations, maps, 360 tours, bookings) are deliberately excluded and will be added to the full platform in a later phase.
The four results of activity A.1.2 and their state of progress.
What the project requires
E1 — Collaborative platform in operation (before 15 October 2026). E2 — Training and materials for users (15 October 2026). E3 — Stakeholder registration and activity reports (15 November 2026). E4 — Maintenance and sustainability plan (15 December 2026).
How this platform meets it
- E1 · Platform in operation — done. The platform runs with resources, forums, working groups, stakeholder directory, calendar and project monitoring; secure hosting and scalable architecture.
- E2 · Training and materials — in progress. User guide and training materials: tutorials, manual, step-by-step guides and FAQ. Each partner designates a content manager; the workshops in the territories are scheduled with them.
- E3 · Registration and activity reports — in progress. Participation report with registered users, active discussions, downloads and recommendations for improvement, produced from the platform’s own records.
- E4 · Maintenance and sustainability plan — in progress. Technical documentation and maintenance plan: architecture, security, data management, content updates, incident resolution and continuity after the project.
Where to check it in this demo
Status
E1 completed. E2, E3 and E4 in preparation, with their pages already published in this demo as the working skeleton.